Heading back to the the VAB...
The launch of NASA's Artemis "mega moon rocket" has been pushed out more than a month, likely to mid-October, after Saturday's (Sept. 3) second launch attempt was canceled because of an engine leak.
The gigantic Artemis 1 rocket — made up of the Orion capsule perched atop the 30-story Space Launch System (SLS) — will be rolled back to the vehicle assembly building, and the next launch window won't open until at least early October, NASA announced (opens in new tab).
__________________
I think the young people enjoy it when I "get down," verbally, don't you?
|