The returned side cores from the Arabsat 6A mission will require analysis to determine reusability. Pending the condition of the side cores, the target launch date is NET Jun 19.— AF SMC (@AF_SMC) April 15, 2019
The returned side cores from the Arabsat 6A mission will require analysis to determine reusability. Pending the condition of the side cores, the target launch date is NET Jun 19.