View Single Post
Old 03-27-2018, 08:56 PM   #362
Dunit35 Dunit35 is offline
Keepin it Real
 
Dunit35's Avatar
 

Join Date: Sep 2004
Location: Oklahoma
Casino cash: $-2062955
Quote:
Originally Posted by Buehler445 View Post
Dad bought one for some fences around our bags and it wouldn’t dig dry dirt to save its ass. Then some help we had broke a hole in the fuel tank.

But if he is doing this to save money he’s not going to want to fork over cash for that. Digging postholes with a post hole digger isn’t bad. As long as you don’t have to do a half mile of them at a time.
I’m thinking about renting an Auger. I have 14-15 (110 ft) holes to dig. Probably doing most of the work myself.

It’s supposed to be a bit for the next few days so I’m hoping it’ll soften the ground up.

Post hole digger is $50. I’m assuming it’s going to take a full day and overnight to dig, add 4x4’s, concrete and let them get set.

If I have 8’ posts do I dig 2 ft down and concrete them in? Or dig the 2’ throw in concrete, then the post and finish with more concrete? As to not have wood direct contact to the soil.

Last edited by Dunit35; 03-27-2018 at 09:02 PM..
Posts: 10,507
Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.Dunit35 wants to die in a aids tree fire.
    Reply With Quote